The construction of Total Exploration and Production Nigeria Limiteds $3.3 billion Egina floating production, storage and offloading, FPSO, vessel is at the verge of completion, as up to ninety-eight percent of the project including design, fabrication and wielding have been completed.
The Egina FPSO project is currently being undertaken by Korea-based Samsung Heavy Industries (SHI) for Total Oil Exploration, with LADOL acting as the local content partner.
0 Likes